SOTEN / INDUSTRIAL APPLICATIONS

GIS Field Capture & GNSS Devices

Create complete feature records with coordinates, attributes, images and asset IDs, connecting field and office GIS work.

GIS field capture & infrastructure records — application illustration
Application illustration · site, device and software configurations vary by project

Project fit & buying priorities

GIS vendors, survey and infrastructure teams, positioning providers and system integrators can assess the workflow, integration and ongoing support together. Operations should define tasks and exceptions, IT should validate interfaces and access, and procurement should compare complete configurations and service scope.

Confirm CRS, external receivers, layer sizes and offline packages with the software provider; high-accuracy work requires a specific positioning configuration.

From field action to a complete record

  1. 01Distribute layers and forms
  2. 02Capture positions and features
  3. 03Add attributes, photographs and asset IDs
  4. 04Review quality and synchronize the geodatabase

System integration & delivery responsibilities

Use feature ID, layer, coordinates, attributes, image, edit version as the integration checklist. Define field ownership, required values and exception handling. Complete one representative job from terminal to API and backend review before scaling to more teams or sites.

SOTEN provides field terminals, interfaces and configuration support. Positioning and GIS partners supply receivers, correction services, coordinate processing and business algorithms. Determine accuracy through tests of the selected system.

Data flow from capture through terminal application to business platform
Suggested data flow; agree interfaces and deployment for the project.

Turn requirements into testable selection criteria

CriterionConfirm with the project teamEvidence to request
Use and configurationConfirm capture methods, environment and operator interaction against the criteria aboveRepresentative jobs, tags and peripheral list
Systems and interfacesGIS / location services / asset and work-order platforms application version, fields, SDKs and protocolsInstallable software, API specification and test account
Operations and supportActual shifts, power, network, mounting and spare-unit planFull-shift test, installation drawing and support responsibilities

Product platforms to evaluate

Select a platform by workflow, then confirm the branch, operating-system version and modules. The suggestions below do not mean every option is included in every configuration.

Pilot validation & procurement acceptance

Use point, line and polygon samples to test coordinate conversion, mandatory fields, photo links, offline editing and conflicts.

  • Operations: confirm completion, exception review and result retrieval against real workflows.
  • IT / integration: verify fields, permissions, offline recovery and duplicate handling.
  • Procurement / support: freeze the tested device, software and accessories, and agree delivery, spares and service terms.

Questions before the project starts

Can this connect to our existing system?

GIS / location services / asset and work-order platforms are integration targets, subject to application compatibility, interface access and SDK validation. Share the software version, API specification and an anonymized workflow sample for a device pilot. Agree device supply, integration and rollout as explicit work packages.

What should we prepare before selecting pilot devices?

Provide CRS, mapping software and sample data, receiver protocols, accuracy requirements and outdoor conditions. Include deployment region, estimated quantity, project stage and intended rollout date to define candidate configurations and a test plan.

FROM REQUIREMENTS TO PILOT

Bring the requirements. Start a device pilot.

Share the deployment region, workflow, interfaces, estimated quantity and project stage.

Share your project

Your next industrial innovation.
Starts with engineering.

Talk to SOTEN about your application, device configuration and system integration.

Contact SOTEN
YOUR PROJECT REQUIREMENTS

Prepare your project brief

Describe your application and integration requirements. Download the brief to your device and share it with SOTEN when you are ready.

IP Geolocation by DB-IP