SOTEN / INDUSTRIAL APPLICATIONS

Asset Inventory & RFID Data Capture

Link issue, transfer, count and repair events through asset IDs so physical condition can be reconciled with the register.

Asset inventory & lifecycle records — application illustration
Application illustration · site, device and software configurations vary by project

Project fit & buying priorities

Production and maintenance managers, plant IT/OT teams, MES/EAM providers and equipment integrators can assess the workflow, integration and ongoing support together. Operations should define tasks and exceptions, IT should validate interfaces and access, and procurement should compare complete configurations and service scope.

Match tags to metal, curved and outdoor surfaces; test batch-reading coverage and cross-reads from neighboring areas.

From field action to a complete record

  1. 01Register assets and physical tags
  2. 02Record issue and location changes
  3. 03Count by area
  4. 04Review discrepancies and maintenance history

System integration & delivery responsibilities

Use asset, tag, custodian, location, transfer, count discrepancy as the integration checklist. Define field ownership, required values and exception handling. Complete one representative job from terminal to API and backend review before scaling to more teams or sites.

SOTEN provides terminal hardware, module adaptation and device-interface support. Software and equipment partners own MES/EAM logic, line control and management platforms. The terminal does not replace a PLC or safety controller.

Data flow from capture through terminal application to business platform
Suggested data flow; agree interfaces and deployment for the project.

Turn requirements into testable selection criteria

CriterionConfirm with the project teamEvidence to request
Use and configurationConfirm capture methods, environment and operator interaction against the criteria aboveRepresentative jobs, tags and peripheral list
Systems and interfacesMES / ERP / EAM / QMS application version, fields, SDKs and protocolsInstallable software, API specification and test account
Operations and supportActual shifts, power, network, mounting and spare-unit planFull-shift test, installation drawing and support responsibilities

Product platforms to evaluate

Select a platform by workflow, then confirm the branch, operating-system version and modules. The suggestions below do not mean every option is included in every configuration.

Pilot validation & procurement acceptance

Transfer and count mixed-material assets, checking missed reads, incorrect ownership, duplicate IDs and history retrieval.

  • Operations: confirm completion, exception review and result retrieval against real workflows.
  • IT / integration: verify fields, permissions, offline recovery and duplicate handling.
  • Procurement / support: freeze the tested device, software and accessories, and agree delivery, spares and service terms.

Questions before the project starts

Can this connect to our existing system?

MES / ERP / EAM / QMS are integration targets, subject to application compatibility, interface access and SDK validation. Share the software version, API specification and an anonymized workflow sample for a device pilot. Agree device supply, integration and rollout as explicit work packages.

What should we prepare before selecting pilot devices?

Provide sample jobs and equipment IDs, peripherals, installation dimensions, application packages and MES/EAM interfaces. Include deployment region, estimated quantity, project stage and intended rollout date to define candidate configurations and a test plan.

FROM REQUIREMENTS TO PILOT

Bring the requirements. Start a device pilot.

Share the deployment region, workflow, interfaces, estimated quantity and project stage.

Share your project

Your next industrial innovation.
Starts with engineering.

Talk to SOTEN about your application, device configuration and system integration.

Contact SOTEN
YOUR PROJECT REQUIREMENTS

Prepare your project brief

Describe your application and integration requirements. Download the brief to your device and share it with SOTEN when you are ready.

IP Geolocation by DB-IP