# GIS Field Capture & GNSS Devices

Canonical source: https://sotengroup.com/solution/gis-mapping-and-surveying-en/
Language: en
Publisher: SOTEN GROUP

Create complete feature records with coordinates, attributes, images and asset IDs, connecting field and office GIS work.

[Explore recommended products](https://sotengroup.com/solution/gis-mapping-and-surveying-en/#products)[Discuss your application](https://sotengroup.com/contact/?lang=en&product=GIS%20field%20capture%20%26%20infrastructure%20records#enquiry)

Application illustration · site, device and software configurations vary by project

## Project fit & buying priorities

GIS vendors, survey and infrastructure teams, positioning providers and system integrators can assess the workflow, integration and ongoing support together. Operations should define tasks and exceptions, IT should validate interfaces and access, and procurement should compare complete configurations and service scope.

Confirm CRS, external receivers, layer sizes and offline packages with the software provider; high-accuracy work requires a specific positioning configuration.

## From field action to a complete record

- 01Distribute layers and forms

- 02Capture positions and features

- 03Add attributes, photographs and asset IDs

- 04Review quality and synchronize the geodatabase

## System integration & delivery responsibilities

Use feature ID, layer, coordinates, attributes, image, edit version as the integration checklist. Define field ownership, required values and exception handling. Complete one representative job from terminal to API and backend review before scaling to more teams or sites.

SOTEN provides field terminals, interfaces and configuration support. Positioning and GIS partners supply receivers, correction services, coordinate processing and business algorithms. Determine accuracy through tests of the selected system.

Suggested data flow; agree interfaces and deployment for the project.

## Turn requirements into testable selection criteria

| Criterion | Confirm with the project team | Evidence to request |
| --- | --- | --- |
| Use and configuration | Confirm capture methods, environment and operator interaction against the criteria above | Representative jobs, tags and peripheral list |
| Systems and interfaces | GIS / location services / asset and work-order platforms application version, fields, SDKs and protocols | Installable software, API specification and test account |
| Operations and support | Actual shifts, power, network, mounting and spare-unit plan | Full-shift test, installation drawing and support responsibilities |

## Product platforms to evaluate

Select a platform by workflow, then confirm the branch, operating-system version and modules. The suggestions below do not mean every option is included in every configuration.

[### H101 Map layers & field formsField-tablet option for maps, layers, forms and peripheral integration.View platform and configurations ↗](https://sotengroup.com/product/hugerock-h101-en/?lang=en)

[### T101 GIS & capture configurationsField map and information-capture platform; choose positioning, identity or hazardous-location configurations.View platform and configurations ↗](https://sotengroup.com/product/hugerock-t101-en/?lang=en)

[### T80 Field maps & asset recordsField tablet platform; review modules and interfaces for mapping, capture or hazardous-location branches.View platform and configurations ↗](https://sotengroup.com/product/hugerock-t80-en/?lang=en)

## Pilot validation & procurement acceptance

Use point, line and polygon samples to test coordinate conversion, mandatory fields, photo links, offline editing and conflicts.

- Operations: confirm completion, exception review and result retrieval against real workflows.

- IT / integration: verify fields, permissions, offline recovery and duplicate handling.

- Procurement / support: freeze the tested device, software and accessories, and agree delivery, spares and service terms.

## Questions before the project starts

### Can this connect to our existing system?

GIS / location services / asset and work-order platforms are integration targets, subject to application compatibility, interface access and SDK validation. Share the software version, API specification and an anonymized workflow sample for a device pilot. Agree device supply, integration and rollout as explicit work packages.

### What should we prepare before selecting pilot devices?

Provide CRS, mapping software and sample data, receiver protocols, accuracy requirements and outdoor conditions. Include deployment region, estimated quantity, project stage and intended rollout date to define candidate configurations and a test plan.

DEFINE YOUR PROJECT

## Start with the workflow. Define the device.

GIS vendors, survey and infrastructure teams, positioning providers and system integrators

[Discuss your project](https://sotengroup.com/contact/?lang=en&product=GIS%20field%20capture%20%26%20infrastructure%20records#enquiry)[sales@soten.com.cn](mailto:sales@soten.com.cn)

CONNECTED CAPABILITIES

## Connect products with solution capabilities.

[### Precision positioning & field work Evaluate terminals, receivers, correction services and GIS software together against the required field accuracy.Explore the capability ↗](https://sotengroup.com/platform/?lang=en#precision-positioning)[### Vehicle terminals & location services Connect vehicle installation, power, positioning and dispatch applications with software and installation partners.Explore the capability ↗](https://sotengroup.com/platform/?lang=en#vehicle-positioning)

RELATED APPLICATIONS

## Explore connected workflows.

[Industrial applications ## Surveying & field position workflows Connect coordinates, attributes, photographs and jobs for surveying software providers and field teams, keeping field records usable in office workflows.Explore the story](https://sotengroup.com/solution/surveying-en/)

[Industrial applications ## Asset inventory & lifecycle records Link issue, transfer, count and repair events through asset IDs so physical condition can be reconciled with the register.Explore the story](https://sotengroup.com/solution/asset-management-en/)

FROM REQUIREMENTS TO PILOT

## Bring the requirements. Start a device pilot.

Share the deployment region, workflow, interfaces, estimated quantity and project stage.

[Share your project](https://sotengroup.com/contact/?lang=en&product=GIS%20field%20capture%20%26%20infrastructure%20records#enquiry)

Content responsibility: [SOTEN GROUP](https://sotengroup.com/about/?lang=en) · Content updated: 2026-10-22

[Datasheets and support guides](https://sotengroup.com/resources/?lang=en) · [Engineering and delivery](https://sotengroup.com/engineering/?lang=en)


<!-- Page cached by LiteSpeed Cache 7.9.2 on 2026-10-24 22:08:49 -->