Project fit & buying priorities
Oil, gas and chemical operators, EAM/IoT integrators, engineering contractors and project buyers can assess the workflow, integration and ongoing support together. Operations should define tasks and exceptions, IT should validate interfaces and access, and procurement should compare complete configurations and service scope.
Mining approvals and ATEX scope are different. Underground and special areas require explicit approval and device review; suitability must not be assumed.
From field action to a complete record
- 01Confirm area and equipment suitability
- 02Assign checklists and responsibilities
- 03Record findings, location and images
- 04Track corrections and reinspection
System integration & delivery responsibilities
Use permitted area, responsibility zone, checklist, finding, correction, review as the integration checklist. Define field ownership, required values and exception handling. Complete one representative job from terminal to API and backend review before scaling to more teams or sites.
SOTEN provides the selected terminal, capture options and interface support. Energy software partners own inspection and asset platforms. The project owner and specialists confirm area classification, certificate scope, installation and safe work.
Turn requirements into testable selection criteria
| Criterion | Confirm with the project team | Evidence to request |
|---|---|---|
| Use and configuration | Confirm capture methods, environment and operator interaction against the criteria above | Representative jobs, tags and peripheral list |
| Systems and interfaces | EAM / inspection / asset IoT platforms application version, fields, SDKs and protocols | Installable software, API specification and test account |
| Operations and support | Actual shifts, power, network, mounting and spare-unit plan | Full-shift test, installation drawing and support responsibilities |
Product platforms to evaluate
Select a platform by workflow, then confirm the branch, operating-system version and modules. The suggestions below do not mean every option is included in every configuration.

H81
UHF capture & hazardous-location branchMultifunction tablet for business forms and capture options; select the system platform and module combination.
View platform and configurations ↗
T80
Inspection forms & T80EX evaluationField tablet platform; review modules and interfaces for mapping, capture or hazardous-location branches.
View platform and configurations ↗
T101
Field maps & T101EX evaluationField map and information-capture platform; choose positioning, identity or hazardous-location configurations.
View platform and configurations ↗Pilot validation & procurement acceptance
Pilot the workflow in permitted areas, then check device documentation and site approvals against project requirements.
- Operations: confirm completion, exception review and result retrieval against real workflows.
- IT / integration: verify fields, permissions, offline recovery and duplicate handling.
- Procurement / support: freeze the tested device, software and accessories, and agree delivery, spares and service terms.
Questions before the project starts
Can this connect to our existing system?
EAM / inspection / asset IoT platforms are integration targets, subject to application compatibility, interface access and SDK validation. Share the software version, API specification and an anonymized workflow sample for a device pilot. Agree device supply, integration and rollout as explicit work packages.
What should we prepare before selecting pilot devices?
Provide area requirements, certificate conditions, tags and instruments, software interfaces and permitted pilot scope. Include deployment region, estimated quantity, project stage and intended rollout date to define candidate configurations and a test plan.
Project-document reference
For hazardous-location projects, consult the official EU ATEX information and have the project team review the selected model documentation against site requirements.



