# Mine Surface Vehicle & Dispatch Devices

Canonical source: https://sotengroup.com/solution/mining-applications-en/
Language: en
Publisher: SOTEN GROUP

Connect dispatch, position and work confirmation for mine-site surface vehicles and crews through software and equipment partners.

[Explore recommended products](https://sotengroup.com/solution/mining-applications-en/#products)[Discuss your application](https://sotengroup.com/contact/?lang=en&product=Mine-site%20vehicles%20%26%20surface%20operations#enquiry)

Application illustration · site, device and software configurations vary by project

## Project fit & buying priorities

Fleet operators, dispatch software vendors, vehicle installation providers and procurement teams can assess the workflow, integration and ongoing support together. Operations should define tasks and exceptions, IT should validate interfaces and access, and procurement should compare complete configurations and service scope.

Validate vibration, dust, power and mounting on the vehicle. Underground or restricted areas require separate mining approvals and communications review.

## From field action to a complete record

- 01Bind vehicle and shift

- 02Receive haulage or equipment jobs

- 03Record loading and site status

- 04Review tracks and shift production records

## System integration & delivery responsibilities

Use vehicle, shift, loading point, haulage order, work state, output record as the integration checklist. Define field ownership, required values and exception handling. Complete one representative job from terminal to API and backend review before scaling to more teams or sites.

SOTEN supplies terminals and interface support. Dispatch partners own assignments and operations; vehicle installers own power, mounting and field maintenance. Vehicle and dedicated control systems retain safety responsibilities.

Suggested data flow; agree interfaces and deployment for the project.

## Turn requirements into testable selection criteria

| Criterion | Confirm with the project team | Evidence to request |
| --- | --- | --- |
| Use and configuration | Confirm capture methods, environment and operator interaction against the criteria above | Representative jobs, tags and peripheral list |
| Systems and interfaces | Dispatch / fleet / work and location platforms application version, fields, SDKs and protocols | Installable software, API specification and test account |
| Operations and support | Actual shifts, power, network, mounting and spare-unit plan | Full-shift test, installation drawing and support responsibilities |

## Product platforms to evaluate

Select a platform by workflow, then confirm the branch, operating-system version and modules. The suggestions below do not mean every option is included in every configuration.

[### K101 In-vehicle dispatch interfaceVehicle or fixed-mount interface terminal; evaluate display, power and equipment interfaces.View platform and configurations ↗](https://sotengroup.com/product/hugerock-k101-en/?lang=en)

[### K80 Vehicle & equipment-mounted displayVehicle and equipment display candidate; confirm configuration against mounting space and interfaces.View platform and configurations ↗](https://sotengroup.com/product/hugerock-k80-en/?lang=en)

[### T71 Mobile or vehicle job terminalMobile and vehicle-workflow platform; evaluate location, capture and specialist application branches.View platform and configurations ↗](https://sotengroup.com/product/hugerock-t71-en/?lang=en)

## Pilot validation & procurement acceptance

Complete routes and loading cycles on representative vehicles, logging mounting, restarts, position gaps and repeated jobs.

- Operations: confirm completion, exception review and result retrieval against real workflows.

- IT / integration: verify fields, permissions, offline recovery and duplicate handling.

- Procurement / support: freeze the tested device, software and accessories, and agree delivery, spares and service terms.

## Questions before the project starts

### Can this connect to our existing system?

Dispatch / fleet / work and location platforms are integration targets, subject to application compatibility, interface access and SDK validation. Share the software version, API specification and an anonymized workflow sample for a device pilot. Agree device supply, integration and rollout as explicit work packages.

### What should we prepare before selecting pilot devices?

Provide vehicle types, power, mounting position, peripherals, dispatch interfaces and typical operating routes. Include deployment region, estimated quantity, project stage and intended rollout date to define candidate configurations and a test plan.

DEFINE YOUR PROJECT

## Start with the workflow. Define the device.

Fleet operators, dispatch software vendors, vehicle installation providers and procurement teams

[Discuss your project](https://sotengroup.com/contact/?lang=en&product=Mine-site%20vehicles%20%26%20surface%20operations#enquiry)[sales@soten.com.cn](mailto:sales@soten.com.cn)

CONNECTED CAPABILITIES

## Connect products with solution capabilities.

[### Vehicle terminals & location services Connect vehicle installation, power, positioning and dispatch applications with software and installation partners.Explore the capability ↗](https://sotengroup.com/platform/?lang=en#vehicle-positioning)[### Domestic platforms & 5G integration Evaluate domestic-platform terminals and connectivity against the operating system, application compatibility and module configuration.Explore the capability ↗](https://sotengroup.com/platform/?lang=en#domestic-5g)

RELATED APPLICATIONS

## Explore connected workflows.

[Industrial applications ## Construction vehicles & site dispatch Retrofit existing construction vehicles with industrial terminals to connect location, assignments and job confirmation to site-dispatch software.Explore the story](https://sotengroup.com/solution/site-vehicles-en/)

[Industrial applications ## Mine-site inspections & corrective work Connect inspections, finding images and corrective tasks for surface and specifically approved mine-site areas.Explore the story](https://sotengroup.com/solution/mining-safety-inspections-en/)

FROM REQUIREMENTS TO PILOT

## Bring the requirements. Start a device pilot.

Share the deployment region, workflow, interfaces, estimated quantity and project stage.

[Share your project](https://sotengroup.com/contact/?lang=en&product=Mine-site%20vehicles%20%26%20surface%20operations#enquiry)

Content responsibility: [SOTEN GROUP](https://sotengroup.com/about/?lang=en) · Content updated: 2026-10-22

[Datasheets and support guides](https://sotengroup.com/resources/?lang=en) · [Engineering and delivery](https://sotengroup.com/engineering/?lang=en)


<!-- Page cached by LiteSpeed Cache 7.9.1 on 2026-10-23 17:54:14 -->